彩钢板的吊装跟安装介绍

返回列表 来源: 发布日期: 2021.03.09

彩钢板的吊装跟安装介绍

彩钢板主要用于建筑装饰行业。彩钢板的安装和吊装方法引起了很多人的兴趣。彩钢板的吊装方法有汽车吊、塔吊、卷扬机、人工吊装等。如果是单层轻钢厂房,屋檐较小,彩钢板可以选择采用人工吊装的方法进行操作,但对于屋檐过高的办公楼,则需要采用卷扬机吊装的方法。由于操作时不会使用大量的机械设备,所以移动灵活、方便、性价比高,这是它的主要优点。

58A5B509ABDABB88D07708E7FAADD8ED

让我们来了解一下彩钢板的安装
1) 测量安装彩钢板的实际长度,我们可以根据测量的长度检查板号对应的板的长度,必要时切割板。
2) 将吊板按排板起算线放在工作面上,并使板宽盖住标志线与起算线对齐。
3) 你可以先用紧固件把两端紧固,然后按一定的顺序安装两块板。
4) 彩钢板安装至放线标志点,复核板安装偏差。当符合设计要求时,紧固板。如果不能满足我们的施工要求,可以在下一个标志段进行适当调整。可在标志段内调整正时,调整标志段后即可进行紧固操作,依次进行安装。

Color steel plate is mainly used in the construction and decoration industry. Many people are interested in the installation and hoisting methods of color steel plate. In fact, there are many hoisting methods of color steel plate, such as truck crane, tower crane, winch and manual lifting. If it is a single-layer light steel factory with small eaves, you can choose to use the manual lifting method to operate, but for the office building with too high eaves, you need to use the winch lifting method. Because the operation will not use a lot of mechanical equipment, it can be moved flexibly, convenient and cost-effective, which is its main advantage.

Let's understand the installation of color steel plate
1) Measure the actual length of the installation plate, we can check the length of the plate corresponding to the plate number according to the measured length, and cut the plate if necessary.
2) Place the plate lifted to the working face according to the starting line of plate arrangement, and make the width of the plate cover the mark line to align with the starting line.
3) You can se fasteners to fasten the two ends first, and then you can install the two plates in a certain order.
4) Install to the setting out mark point to review the deviation of plate installation. When it meets the design requirements, fasten the plate. If it can not meet our construction requirements, it can be adjusted properly in the next sign section. The timing can be adjusted in the sign section, ad then the fastening operation can be carried out after adjusting the sign section, and the installation can be carried out in turn.