彩钢活动房墙体抗震、保温优点多

天物彩板专注彩板行业16年——更多黄冈大量彩钢板批发厂家_黄冈彩涂卷最新价格请拨打网站上方电话咨询

 彩钢活动房墙体均采用彩钢板轻质隔热夹芯板组合是经过抗风等级测试的,选用我们彩钢活动房厂家的产品能有效保证其产品的保温隔热效果更显著,重量轻每m2板自重10-14kg,仅为砖混墙建筑的1/30,国外称为水面建筑。隔热性能好:导热系数为0.035瓦/米*度,亦具有良好的阻热、防潮、防寒、隔热性能。强度好、材料节约、使用寿命长:可做墙板、屋面板,既是承重结构,又是围护结构,一般房屋不用梁柱,无须表面装饰,外露的彩色钢板,一般15-20年内其防腐层不脱落。安装灵活、快捷:板块可再拼装组合,不需吊装机械,可多次拆装,重复使用。、

    彩钢活动房施工前准备工作:
    1、施工前应认真组织有关技术、施工人员进行图纸会审和技术交底。  
    2、查看现场三通一平的情况,各种构件及板材的堆放场地应高出路面10cm,以防积水。  
        3、根据本工程的实际施工需要,现场需接通380V和220V电源,计算好所需要足够的电源线,作好分配电箱的接电工作。  
    4、拟定送货车辆的行进路线及材料进场后的堆放场地,以确保道路畅通、不影响施工为准。  
    5、对土建基础的平面尺寸及水平进行测量、复核,确保工程施工顺利进行,如有误差,及时通知项目部进行修正。

The walls of the color steel activity room are all made of color steel plate light heat insulation sandwich board, which has been tested for wind resistance. The products of our color steel activity room manufacturers can effectively ensure that the heat insulation effect of their products is more significant. The weight is 10-14kg / m2, which is only 1 / 30 of the brick concrete wall building. It is called water surface building in foreign countries. Good heat insulation performance: the thermal conductivity is 0.035 w / m * degree, and it also has good heat resistance, moisture-proof, cold resistance and heat insulation performance. Good strength, material saving and long service life: it can be used as wall panel and roof panel, which are both load-bearing structure and enclosure structure. Generally, the house does not use beams and columns, and does not need surface decoration. The exposed color steel plate generally does not fall off its anti-corrosion coating within 15-20 years. Flexible and fast installation: the plates can be reassembled and assembled again without hoisting machinery, and can be disassembled and reused for many times. ,

Preparation before construction of color steel activity room:
1. Before construction, relevant technicians and constructors shall be organized to conduct joint review of drawings and technical disclosure.
2. Check the condition of "three connections and one leveling" on site. The stacking site of various components and plates shall be 10cm higher than the road surface to prevent water accumulation.
3. According to the actual construction needs of the project, 380V and 220V power supply shall be connected on site, sufficient power lines shall be calculated, and the power connection of distribution box shall be done well.
4. The route of the delivery vehicles and the stacking site after the materials enter the site shall be determined to ensure that the road is smooth and does not affect the construction.
5. Measure and recheck the plane size and level of the civil foundation to ensure the smooth progress of the project construction. In case of any error, inform the project department in time for correction.