1.彩钢活动房施工现场准备。在这方面,主要是根据活动室的建筑平面图进行场地清理。要保证场地平整,运输过程中的道路要进行修缮。另外,这种配电箱不会在现场施工中损坏。对于施工人员,根据施工现场的情况安装一些临时住所,记得要合理安排。
4.彩钢活动房根据施工现场的需要,采购的材料的数量和种类。开工前,要对材料的选择做出明确的选择,确保采购的材料不会出现问题,同时选择合理的运力将其运至施工现场。
1. Construction site preparation. In this respect, the site cleaning is mainly carried out according to the building plan of the activity room. To ensure that the site level, transport process of the road to be repaired. In addition, the distribution
box will not be damaged in the field construction. For some temporary residence, the construction personnel should be arranged reasonably according to the construction site.
2. Preparation of construction technology. Before construction,
the drawings must be rechecked to ensure that there are no errors in the construction process. Secondly, the project content and construction personnel should be explained clearly to avoid some unnecessary mistakes in the construction process.
3。 Material preparation. When attacking construction, all materials should be in place to avoid affecting the construction progress. At the same time, the mode and location of all materials shall be ensured. The use of inferior materials is strictly
prohibited. Accidents will occur only after the completion of the project.
4. According to the needs of the construction site, the quantity and type of materials to be purchased. Before the commencement of construction, it is necessary to make
a clear choice on the selection of materials to ensure that the purchased materials will not have problems, and select reasonable transportation capacity to transport them to the construction site.