净化彩钢板以其自身的特点,在应用中得到了广泛的应用,其使用效果也比较稳定,但在其施工过程中,仍需注意一些监理事项,以保证运行的稳定性,净化板施工过程中应注意哪些监理要点?下面小编就给大家详细介绍一下:

703f00e1936c390849cd22d2e10b508d_
1、 净化彩钢板施工前,应按设计、法规及有关技术标准的要求,编制本工程节能保温专项施工方案,并对施工人员进行技术交底和培训。
2. 净化彩钢板外保温系统按施工图设计文件及施工方案进行。
3、在施工过程中进行现场指导,配合施工单位和现场监理做好施工质量控制工作。
4、材料进场后,按规格、数量、质量要求进行验收,并由专人进行超声波探伤入库。禁止打桩
在户外。
5、施工期间,基层温度和施工环境温度不得低于5℃。五级以上大风、雨雪天气禁止施工。
6、 净化彩钢板在大规模施工前,应采用相同的材料、结构做法和工艺在现场制作样板墙,经有关方面确认后方可施工。
7、施工过程中,作业人员应穿戴个人防护用品,保护职业健康,注意施工防护。
8、施工中使用的净化板应送有资质的检测机构检测,检测合格后方可使用。
9.净化板的粘贴应采用粘贴法或点胶法,粘贴面积不应小于50%。涂胶后,在保温板下端粘贴基层,基层自下而上水平铺设,铺设时锚固。

Purificaon board with its own characteristics, has been widely used in the application, and its use effect is relatively stable, but in the process of its construction, we still need to pay attention to some supervision matters, in order to ensure the stability of operation, which supervision points should be paid attention to in the construction process of purification board? The following editor will give you a detailed introduction:

1. Before the construction of purification board, the special construction scheme for energy conservation and thermal insulation of the project shall be prepared according to the requirements of design, regulations and relevant technical standards, and the technical disclosure and training shall be conducted for the construction personnel.
2. The external thermal insulation system of purification Board shall be carried out in accordance with the construction drawing design documents and construction scheme.
3. Conduct on-site guidance in the construction process, and cooperate with the construction unit and on-site supervision to do a good job in construction quality control.
4. After entering the site, the materials shall be checked and accepted according to the specification, quantity and quality requirements, and then ut into storage by special personnel. No piling
In the open air.
5. During the construction period, the temperature of base course and construction environment shall not be lower than 5 ℃. Construction is not allowed in gale, rain and snow weather above level 5.
6. Before the large-scale construction of the purification board, the same materials, structural practices and processes shall be used to make the sample wall on site, and the construction can be carried out only after the confirmation of the relevant parties.
7. During construction, operators should wear personal protective equipment, protect occupational health and pay attention to construction protection.
8. The purification board used in the construction shall be sent to the qualified testing organization for testing, and can be used after passing the test.
9. The paste method or dispensing method should be used to paste the purification board, and the paste area should not be less than 50%. After gluing, the lower end of the insulation board shall be pasted with base course, which shall be laid horizontally from bottom to top and anchored during laying.