联系我们收藏本站在线留言网站地图欢迎进入唐山天物彩板集团有限公司官网!

彩板厂家_彩涂板价格_彩涂卷厂家_彩涂板价格_天物集团

天物彩板-始于2004 专注功能性高端彩板生产销售
服务热线: 400-060-9166
服务热线: 13931586578
彩板厂家

如何对净化夹芯板进行安装

返回列表 来源: 发布日期: 2020.02.15

如何对净化夹芯板进行安装

天物彩板专注彩板行业16年——100平方活动板房多少钱_净化夹芯板安装_天物彩板请拨打网站上方电话详细咨询

夹芯板装置净化前的放线应在地面(地板)及其它与装置有关的条件完成后进行,如大型设备已运到位,对地下暗管进行了调整,基本完成了技能夹心器操作。放线是在地面上标出净化夹芯板的水平投影(50 mm宽)和门窗的方位。上下槽中心线应在同一直线面上1.0%或3mm以内。

氟碳彩涂板

安装上下电缆管道。下滚道一般采用内外R角铝合金制造。把钉子钉在地上画的线上。钉的方向应距直线1.2-1.5m,距转角和端部0.2m。射钉前在槽下垫两条橡胶条(φ2-3)。钉子固定后,会形成防水屏障。上部电缆管道为受限铝。天花板硬时,用钉子枪固定在顶板上。当吊顶较软时,用吊杆将其悬挂在层下。高度以天花板净高为准。
壁板安装要详细,预制构件按排图安装,相邻壁板由构件间固定插件确定。值得注意的是,电气暗敷管线、箱盒与墙板应协调良好。墙板应平直,垂直缝应严密。缝越小越漂亮,垂直缝越均匀。在运行中,垂直缝上的维护膜应仔细布置,并临时揭开,不得拆除。清理罐内杂物和胶液,使硬块凝固。否则,很难用最大的力均匀、紧密地调整垂直接缝。
The setting out before the purification of sandwich panel device shall be carried out after the completion of the ground (floor) and other relevant conditions with the device, such as the large equipment has been transported in place, the concealed ground pipeline has been adjusted and the skill sandwich device operation has been basically completed. Setting out is to mark the horizontal projection (50 mm wide) of the purification sandwich panel and the orientation of the door and window on the ground. The center line of the upper and lower manger shall be within 1.0% or 3mm on the same straight surface.
Install the upper and lower raceways. Generally, the lower raceway is made of aluminum alloy with R angle inside and outside. Fix the nail on the line drawn on the ground. The direction of the nail should be 1.2-1.5m away from the straight line, and 0.2m away from the corner and the end. Put two rubber strips (Ф 2-3) under the groove before the nail is shot. After the nail is fixed, it will form a waterproof barrier. The upper raceway is restricted aluminum. When the ceiling is hard, it is fixed on the top plate with nail gun. When the ceiling is soft, it is suspended under the layer with suspender. The height shall be subject to the clear height of the ceiling.
The wall panels shall be erected in detail, and the prefabricated components shall be installed according to the row map, and the adjacent wall panels shall be determined by the fixed plug-ins between the components. It is worth noting that the concealed electrical laying pipelines and boxes shall be well coordinated with the wall panels. The wall panel should be straight, and the vertical seam should be tight. The smaller the seam, the more beautiful it is, and the vertical seam is even. During operation, the maintenance membrane on the vertical seam shall be carefully arranged and uncovered temporarily, and never be removed. Clean up the sundries in the tank and the adhesive liquid to coagulate the hard block. Otherwise, it is difficult to adjust the vertical joint evenly and compactly with the largest force.
【相关推荐】

咨询热线

400-060-9166