天物粉末喷涂彩板——彩板行业新革命,无尘净化车间彩涂板定制详细请拨打网站上方咨询
众所周知,高端产业很大一部分离不开无尘净化车间,如CCL电路基板铜复合板、PCB印刷电路板、光电液晶屏和led、电源和3C锂电池等,还有一些医药和食品行业。随着科学技术的发展,制造业配套产品的质量标准不断提高。因此,工业生产企业不仅需要从生产工艺上进行产品创新,还需要改善产品的生产环境,严格执行车间环境要求,提高产品质量和稳定性。
无论是产品质量的升级和现有工厂的改造,还是由于市场需求的新工厂的扩建,工业厂商都将面临项目的准备,这是关系到企业未来的重大问题。从基础设施建设到配套装修,从技术到设备采购,一系列复杂的工程过程,在这个过程中,编制方最应该关心的是工程质量和综合成本。以下简要介绍在工业厂房筹建过程中影响无尘净化车间成本的几个因素:
空间因素:
空间因素由车间面积和车间层高组成,直接影响室内装修和围护成本:彩钢隔断和吊顶面积;空调投入成本:所需空调负荷的面积容积、空调送回风方式,空调管道走向及空调末端编号。
为避免因场地原因增加工程投资,施工方可综合考虑两个方面:不同生产工艺设备的工作空间(包括移动和维护的高度或宽度裕量);人员流动和物流的空间趋势。目前,该建筑遵循节约用地、节约材料、节约能源的原则,因此净化车间越大越好。在准备施工时,要考虑自己的生产工艺设备和工艺,能有效避免不必要的投资成本。
As we all know, a large part of high-end industries cannot be separated from dust-free purification workshop, such as CCL circuit substrate copper clad plate, PCB printed circuit board, photoelectric liquid crystal screen and led, power and 3C lithium battery, and some pharmaceutical and food industries. With the development of science and technology, the quality standard of supporting products for manufacturing industry has been continuously improved. Therefore, industrial manufacturers not only need to innovate products from production process, but also need to improve the production environment of products, strictly enforce the requirements of workshop environment, and improve product quality and stability.
Whether it is the upgrading of product quality and the reconstruction of existing plants, or the expansion of new plants due to market demand, industrial manufacturers will face the project preparation, which is a major issue related to the future of enterprises. From infrastructure construction to supporting decoration, from technology to equipment procurement, a series of complex project processes, in this process, the preparation party should be most concerned about the project quality and comprehensive cost. The following is a brief introduction of several factors that affect the cost of dust-free purification workshop during the preparation of industrial plant:
space factor:
The space factor is composed of workshop area and workshop floor height, which directly affects the cost of interior decoration and enclosure: color steel partition and ceiling area; air conditioning input cost: area volume of required air conditioning load, air conditioning supply and return mode, air conditioning pipeline direction and air conditioning terminal number.